精品一区二区三区在线观看l,一区二区三区免费在线,亚洲欧美日韩一级特黄在线,亚洲一区二区三区在线视频,欧美区一区二区三,国产免费一级视频,一区二区不卡视频

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Q & A

Why are pile foundation test piles designed differently from ordinary piles

  • Author:Libo
  • Source:wwww.hanwenled.com
  • Date:2021-06-11
  • Click:0

If the reinforcement is different. Considering that the test pile should bear much more force than ordinary engineering pile (generally more than twice), in order to avoid the failure of the test due to the strength of the pile itself in the test process, the pile body is strengthened.

Online
聯(lián)系方式

熱線電話

18739187123

上班時間

周一到周五

公司電話

0391-7588881