精品一区二区三区在线观看l,一区二区三区免费在线,亚洲欧美日韩一级特黄在线,亚洲一区二区三区在线视频,欧美区一区二区三,国产免费一级视频,一区二区不卡视频

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Q & A

Installation method of insulation joint

  • Author:Libo
  • Source:wwww.hanwenled.com
  • Date:2021-06-11
  • Click:0

Installation requirements:

1. The insulation joint shall be installed within 50 meters to avoid a dead opening to be welded.

2. After the insulation flange is connected with the pipeline, do not lift the pipeline within 5 meters of the connector.

3. Pressure test of insulation joint and pipeline instrument.

4. After the insulation joint is connected with the pipeline, the surface temperature of the insulation joint should not be higher than 120℃ during the repair and anti-corrosion work as required.

5. The insulation joint can be installed on the underground straight pipe section.

6. When the insulation joint is installed on the ground, it should be installed on the straight pipe section 20 meters away from the elbow and a support should be provided.

7. Avoid burying the installation in a place where there is perennial water.

8. The central wheelbase of the joint shall be installed on a straight line with the central wheelbase of the pipeline, and the two central wheelbases shall not be greater than 0.2mm when installed.


Online
聯(lián)系方式

熱線電話

18739187123

上班時(shí)間

周一到周五

公司電話

0391-7588881